Solar PV plant design targets maximum energy yield and the lowest levelised cost of energy. ZHONGRUN HUAXING delivers full-cycle design — from solar resource assessment, module and inverter selection, array layout, step-up substation and transmission line, to grid connection studies — covering utility-scale, C&I rooftop and distributed scenarios.
Full concept design: solar resource analysis, yield calculation, ATS-based uninterrupted supply concept
9.5 MWp PV + 5MW/10MWh BESS
Following IEC 61724 and IEEE 1547, we use PVsyst and time-series simulation for yield estimation and shading analysis, and perform load-flow, short-circuit and harmonic studies on the grid side, producing grid-code-compliant connection reports.


Tell us your project profile and local grid requirements — preliminary technical feedback within 48 hours.
Contact Us