Wind farm engineering hinges on the accuracy of resource assessment and the reliability of the grid-integration scheme. ZHONGRUN HUAXING provides end-to-end technical services — from topographic survey and wind resource processing to micro-siting and turbine layout optimization — ensuring bankable yield estimates and approvable grid-connection plans.
Feasibility study for a mountainous wind farm (approx. 398 GWh annual generation)
200 MW (32×6.25MW) · 40MW/80MWh BESS · 220 kV substation
We apply the IEC 61400 series and local grid codes, using CFD wake simulation to minimise wake losses and annual time-series modelling to verify yield. On the grid side we perform short-circuit, power quality and protection coordination studies to ensure the plant is bankable and operable.


Tell us your project profile and local grid requirements — preliminary technical feedback within 48 hours.